8 Common Problems in Plastering & Coating Projects and How to Prevent Them

 In construction projects, wall coatings and plastering systems affect not only appearance, but also durability, waterproofing performance, and long-term maintenance costs.

Many projects experience problems such as:

Exterior wall cracking and peeling

Efflorescence and chalking

Damp stains in bathrooms

Uneven corners and edges

Cracks between walls and ceilings

Although these seem like surface defects, most are actually caused by substrate treatment, material selection, and improper construction practices.

1. Exterior Wall Paint Cracking & Peeling

Main Causes

Plaster applied too thick without layered application

Dust remaining on substrate before coating

No mesh reinforcement at different substrate joints

Poor quality exterior putty

Painting before walls are fully dry

Prevention Solutions

Apply plaster in layers with proper curing

Remove all sanding dust before painting

Use mesh reinforcement at wall junctions

Select weather-resistant exterior putty

Avoid construction under rain or strong sunlight



2. Damp & Peeling Walls in Bathrooms and Balconies

Main Causes

Insufficient waterproofing height

Waterproof layer damaged during later works

Poor tile joint sealing

Improper slope causing water accumulation

Prevention Solutions

Waterproofing height in shower areas should exceed 2000mm

Conduct 24-hour water retention test after waterproofing

Use sealant at wall-floor joints

Ensure proper drainage slope

3. Efflorescence, Chalking & Peeling on Exterior Walls

Main Causes

High alkalinity of substrate

Poor water resistance of paint

Low quality putty

Construction during rain or low temperature

Excessive water added during mixing

Prevention Solutions

Apply coating only after proper curing age

Use alkali-resistant primer

Select water-resistant coating systems

Control water addition strictly

正在上传:已上传 103901 字节(共 103901 字节)。




4. Cracks Between Wall and Ceiling

Main Causes

Different shrinkage rates of materials

No anti-crack mesh reinforcement

Poor treatment at pipe groove repairs

No corner protection between ceiling and wall

Prevention Solutions

Install mesh at material transition areas

Use polymer anti-crack mortar for groove repair

Install PVC corner beads at ceiling joints

5. Uneven Plaster Surface & Poor Corner Alignment

Main Causes

No leveling guides before plastering

Plaster applied too thick at one time

Different water absorption of substrates

Premature finishing before setting

Prevention Solutions

Use laser or leveling guides

Apply plaster in layers

Pre-wet wall surfaces

Use corner tools for alignment

Construction Quality Depends on More Than Materials

Most wall failures are not caused by paint quality alone.



The real key factors include:

Substrate strength

Moisture control

Plastering process

Material compatibility

Site management

Only when substrate, mortar, putty, and coating systems work together properly can long-term wall durability be achieved.

ARICH focuses on construction additives for drymix mortar systems, including:

HPMC / MHEC

Redispersible Polymer Powder (RDP)

Tile Adhesive Solutions

Skim Coat & Putty Systems

Gypsum & Plaster Solutions



评论

此博客中的热门博文

Innovating for the Future: High-Performance Building Additives by ARICH CELLULOSE®

Innovating for the Future: High-Performance Building Additives by ARICH CELLULOSE ® Driving Innovation in Construction Materials-ARICH CELLULOSE ® In today’s fast-evolving construction industry, efficiency, durability, and sustainability are key factors shaping the future. At ARICH CELLULOSE ® , we are at the forefront of innovation, providing high-performance powder additives that enhance construction materials' workability, strength, and longevity. As a global leader in the manufacturing and supply of Hydroxypropyl Methyl Cellulose (HPMC), Redispersible Polymer Powder (RDP), Polycarboxylate Superplasticizer (PCE Powder), Gypsum Retarder, and Powder Defoamer, we are committed to delivering cutting-edge solutions that meet the diverse needs of our clients worldwide. The Power of Advanced Formulation Our expertise lies in combining scientific research, state-of-the-art automation, and rigorous quality control to create additives that optimize the performance of cement-based and gyp...

❌ Still Struggling with Tile Falling or Hollowing? This Complete Tile Adhesive Construction Guide Solves It Once and for All!

Tile installation seems simple, but it’s a craft where details make the difference . Most issues like tile falling, hollowing, or poor bonding are not caused by the adhesive itself — but by improper construction steps . For strong, level, and durable results, you must master these three essentials: 👉 Proper surface preparation, accurate mixing, and professional thin-bed application. 1. Surface Preparation — The Foundation of Success ✅ Materials and Tools Tile Adhesive Selection (Based on Beijing Standard DB11/T 344-2024): Application Area Recommended Type Interior Wall (Ceramic Tile)     C1 Type Vibration Areas (Elevator Shaft, etc.)     C2TS1 Type Underfloor Heating, Balcony, Outdoor     C2TES1 Type (Enhanced) Low-Absorption Tiles (<0.5%) like Porcelain or Sintered Slabs     C2 Enhanced Type                 Main Tools: Electric mixer, mixing bucket, notched trowel (8–10mm ...

🔥Tiles Keep Debonding or Sound Hollow? 99% of Failures Come From These Details!

  1. Improper Application — The No.1 Cause of Tile Adhesive Failure (1) Wrong Mixing Method = Adhesive Performance Destroyed Common Symptoms: Dries too fast → thickens before application Dries too slow → stays soft for a whole day Poor bonding strength Causes: Insufficient mixing Wrong water ratio High temperature speeding up drying Low temperature/humidity slowing curing Correct Method: Add water first, then powder; mix twice with 3–5 min rest Follow exact water ratio Never add cement or sand (destroys formula → hollowing & debonding) (2) Wrong Tiling Technique — Dot-Mounting Is the Biggest Killer Symptoms: Hollow sound Edges lifting Whole tile falling off with backside clean Causes: Dot-mounting or thick-bed method → insufficient contact area Dust or release agent on tile backside Correct Method: Must use Thin-Bed Method + Double-Sided Buttering Coverage rate must be ≥90% Clean tile backs before installat...