Importance of Plaster Mortar Curing
Curing plaster mortar is crucial in construction to ensure wall quality, bonding strength, and durability. Proper plaster mortar curing times help prevent cracks, hollowing, and improve subsequent works such as tiling or waterproofing. Construction professionals should plan curing periods based on mortar type and environmental conditions.
1️⃣ Ordinary Cement Mortar Curing
Ordinary cement mortar is one of the most commonly used plaster materials. Under normal temperature (around 20℃) and humidity, it should be cured for at least 7 days. Keeping the surface moist promotes cement hydration, improves strength, and reduces the risk of cracking.
Keywords: cement mortar curing, plaster mortar curing time
2️⃣ Cement-Lime Mortar Curing
Cement-lime mortar combines the strength of cement with the flexibility of lime. A curing period of at least 7 days ensures full hardening and optimal bonding. Lime content is moisture-sensitive, so proper wet curing is essential.
Keywords: cement-lime mortar curing, plaster mortar construction
3️⃣ Waterproof Mortar Curing (with Admixtures)
Waterproof mortar is used in wet environments or for waterproof layers. Its performance depends on proper curing. Cure for at least 14 days, keeping the surface moist or covered with wet cloth to ensure full reaction of cement and waterproof admixtures.
Keywords: waterproof mortar construction, waterproof plaster mortar curing
4️⃣ Special Substrates and Pre-Tiling Curing
For aerated concrete or other special substrates, to ensure stability and bonding, it is recommended to cure for 14 days before tiling or subsequent works. Early construction may cause hollowing, cracking, or poor adhesion.
Keywords: tiling construction, plaster mortar substrate curing
5️⃣ Hot or Dry Climates
In hot or dry conditions, curing time remains the same, but additional watering or covering with wet cloth is needed to prevent rapid moisture loss and avoid cracking or hollowing.
Keywords: hot climate plaster curing, dry weather construction
6️⃣ Winter Construction
Winter construction requires frost protection. Cure under positive temperature conditions for at least 7 days. Follow antifreeze admixture instructions carefully to maintain mortar performance and construction safety.
Keywords: winter plaster curing, antifreeze mortar construction
- Summary & Recommendations
- Ordinary plaster mortar: 7 days is the minimum
- Waterproof mortar or pre-tiling substrate: 14 days is safer
- Keep surfaces moist, especially in dry, hot, or winter conditions
- Proper plaster mortar curing ensures high-quality, durable walls