跳至主要内容

The exterior wall putty is not strong, and customers complain repeatedly? How to solve the problem!

The solution to the problem of insufficient strength of exterior wall putty requires targeted measures based on the construction stage and severity. The core methods include water spraying maintenance and using penetrating primer to optimize the construction process. In severe cases, the problem needs to be removed and redone.

Water Spraying To Improve Strength

Since the main component of exterior wall putty is cement, it can be cured by spraying water or rolling to promote cement hydration reaction and enhance the overall strength of the putty layer.

Use A Clear Penetrating Primer

~Avoid using colored alkali-resistant sealing primers and use transparent penetrating primers instead, which have stronger penetration and can penetrate deep into the putty base to form a reinforcement layer.

~During construction, add appropriate amount of water to dilute the primer to enhance penetration and improve adhesion.

~Avoid direct sunlight during wall construction to prevent the primer from forming a film too quickly and affecting penetration.

Optimize Construction Process

‌~‌Control the thickness of the scraping: the single scraping should not exceed 1mm, and the application should be carried out in thin layers multiple times to avoid cracking due to excessive thickness causing dry surface and wet inside.

‌~‌Base treatment: For loose or high water absorption bases, first apply environmentally friendly wall solidifier or penetrating treatment agent to enhance the density of the base.

‌~‌Environmental control: Avoid construction in high temperature and high humidity environments, and ensure that the drying time of each layer is ≥ 4 hours.


Partial Or Complete Eradication And Redoing

~‌Local strength is insufficient: remove loose parts, clean and re-hang the mesh for repair, and use qualified cement mortar or special repair putty.

~‌Large area lack of strength‌: Remove all problematic putty layers, re-spray, hang mesh and standardize plastering to ensure that the base meets the construction standards.

~‌Note: If problems such as hollowing and peeling have occurred, it is difficult to cure them by relying solely on primer or maintenance. The problem layer must be completely removed and rework must be carried out in a standardized manner.


评论

此博客中的热门博文

Innovating for the Future: High-Performance Building Additives by ARICH CELLULOSE®

Innovating for the Future: High-Performance Building Additives by ARICH CELLULOSE ® Driving Innovation in Construction Materials-ARICH CELLULOSE ® In today’s fast-evolving construction industry, efficiency, durability, and sustainability are key factors shaping the future. At ARICH CELLULOSE ® , we are at the forefront of innovation, providing high-performance powder additives that enhance construction materials' workability, strength, and longevity. As a global leader in the manufacturing and supply of Hydroxypropyl Methyl Cellulose (HPMC), Redispersible Polymer Powder (RDP), Polycarboxylate Superplasticizer (PCE Powder), Gypsum Retarder, and Powder Defoamer, we are committed to delivering cutting-edge solutions that meet the diverse needs of our clients worldwide. The Power of Advanced Formulation Our expertise lies in combining scientific research, state-of-the-art automation, and rigorous quality control to create additives that optimize the performance of cement-based and gyp...

🔥Tiles Keep Debonding or Sound Hollow? 99% of Failures Come From These Details!

  1. Improper Application — The No.1 Cause of Tile Adhesive Failure (1) Wrong Mixing Method = Adhesive Performance Destroyed Common Symptoms: Dries too fast → thickens before application Dries too slow → stays soft for a whole day Poor bonding strength Causes: Insufficient mixing Wrong water ratio High temperature speeding up drying Low temperature/humidity slowing curing Correct Method: Add water first, then powder; mix twice with 3–5 min rest Follow exact water ratio Never add cement or sand (destroys formula → hollowing & debonding) (2) Wrong Tiling Technique — Dot-Mounting Is the Biggest Killer Symptoms: Hollow sound Edges lifting Whole tile falling off with backside clean Causes: Dot-mounting or thick-bed method → insufficient contact area Dust or release agent on tile backside Correct Method: Must use Thin-Bed Method + Double-Sided Buttering Coverage rate must be ≥90% Clean tile backs before installat...

❌ Still Struggling with Tile Falling or Hollowing? This Complete Tile Adhesive Construction Guide Solves It Once and for All!

Tile installation seems simple, but it’s a craft where details make the difference . Most issues like tile falling, hollowing, or poor bonding are not caused by the adhesive itself — but by improper construction steps . For strong, level, and durable results, you must master these three essentials: 👉 Proper surface preparation, accurate mixing, and professional thin-bed application. 1. Surface Preparation — The Foundation of Success ✅ Materials and Tools Tile Adhesive Selection (Based on Beijing Standard DB11/T 344-2024): Application Area Recommended Type Interior Wall (Ceramic Tile)     C1 Type Vibration Areas (Elevator Shaft, etc.)     C2TS1 Type Underfloor Heating, Balcony, Outdoor     C2TES1 Type (Enhanced) Low-Absorption Tiles (<0.5%) like Porcelain or Sintered Slabs     C2 Enhanced Type                 Main Tools: Electric mixer, mixing bucket, notched trowel (8–10mm ...