Discover the putty isn't sticking after 80% of the work has been done? The only correct solution is to avoid taking unnecessary detours.

When a large area of exterior putty has already been applied, but you suddenly notice powdering, weak adhesion, or peeling , the correct response is: 👉 Stop work immediately + Diagnose accurately + Apply the right solution. Below is a professional, engineering-level guide. Step 1: Stop All Work and Diagnose the Issue 🔹 1. Check the severity Mild: Slight powdering with a nail; tape test pulls off light powder. Moderate: Heavy powdering when rubbed; tape removes large patches. Severe: Putty can be removed easily with a scraper; layer is loose and weak. 🔹 2. Common causes Substrate issues Weak, chalky, or sandy base Dust, oil, or release agents Highly absorbent substrate, not pre-wetted Smooth concrete without bonding agent Putty issues Low-quality or expired putty Wrong additives mixed by workers Poor mixing Application issues One-pass overly thick application Applying next layer before the previous layer dries Fast drying ...

English Blog Version (SEO Optimized) Foam Sealant or Waterproof Mortar for Window Frame Gap Filling? Here Is the Final, Code-Based Answer

Water leakage around exterior windows is one of the most common and persistent quality issues in residential construction. The debate over whether to use foam sealant or waterproof mortar for gap filling has lasted for years. However, based on national codes, regional guidelines, and extensive project experience, the conclusion is now clear: Different locations require different materials — no single solution fits all. 1. Source of the Debate: Early Codes Were Misinterpreted The earlier code GB50327-2001 stated: “ Cement mortar shall not be used for filling gaps between the window frame and wall; elastic materials shall be used. ” Because this clause has never been updated, many mistakenly believed that mortar is prohibited for all window gap filling. However, as waterproofing requirements increased, this clause became insufficient for modern construction environments. 2. Updated Codes Clarify That Waterproof Mortar Is Allowed The current code JGJ214-2010 clearly specifies...

In-depth Analysis of Concrete Admixtures: The Core Technology Behind High-Performance Concrete

  I. Definition and Fundamental Role Definition: Concrete admixtures are materials added during or before mixing, typically in quantities not exceeding 5% of the cement mass (except in special cases), used to modify and improve concrete performance. Functions: Enhance workability and consistency of fresh concrete Optimize mechanical strength and durability of hardened concrete Provide specific functions such as waterproofing, corrosion resistance, and frost protection Admixtures influence the hydration kinetics and microstructure of cementitious materials through physical dispersion and chemical interaction, thus refining the overall performance of concrete. II. Main Types and Functional Categories 1. Workability Enhancers Water-reducing Agents (Superplasticizers) The most critical and widely applied type of admixture. Lignosulfonate-based: 5–10% water reduction, low cost, mild retardation. Naphthalene/Melamine-based: 12–25% reduction, suitable for standa...

Concrete Curing Timeline — Every Hour Counts!Forget one step, and you may face cracks or rework.

  1️⃣ Before Final Set — Start Curing Within 8–12 Hours Key: 8–12 Rule Start natural curing within 8–12 hours after pouring, before concrete’s final set. 🔹 Delays cause surface cracks and reduced strength. 2️⃣ Post-Pour Joint — Cover Within 12 Hours Key: Cover in 12 Hours Cover and keep the joint moist within 12 hours after pouring to avoid shrinkage cracking. 3️⃣ Cement Mortar Plaster — Begin Curing After 24 Hours Key: 24-Hour Rule Cure under moist conditions 24 hours after plastering to prevent powdering and cracking. 4️⃣ Waterproof & Crystalline Layers — Spray for 3–7 Days Key: Spray 3–7 Days Apply uniform mist curing for 3–7 days before water testing. 5️⃣ Concrete After Pouring — Cover Within 12 Hours Key: 7 or 14 Rule Cover and keep moist within 12 hours. Ordinary or slag cement: ≥7 days . Waterproof or retarded concrete: ≥14 days . 6️⃣ Surface Layer — Cure ≥7 Days, Walk Only After 5 MPa Key: 7 Days, 5 MPa Rule Cure for at least 7 days. Allow ...